Holy Roller Preservation Project
Photo Gallery

Photos from 07 August 2021 - Removing Driver's and Co-driver's hatches

Photos from 14 August 2021 - Clearing more components from the hull

Photos from 18 August 2021 - Clearing more components from the hull

Photos from 25 August 2021 - Clearing more components from the hull

Photos from 28 August 2021 - Reorganizing the Seacan and pulling the Ball MG Mount

Section Title

07 August 2021 - With General Dynamics delivering the Seacan, the priority of this session was moving all the parts that have been removed from HR into the Seacan. That clears up the work area. Also, the two upper fuel tanks have been taken out and the Driver and Co-Driver hatches have been taken off

14 August 2021 - clearing more large components from the hull. Codriver's seat, 75mm Ammo Rack, 30 Cal MG Ammo rack and the Escape Hatch came out

18 August 2021 - clearing more large components from the hull. Co-Driver's hatch, driver's seat, and steering controls.

25 August 2021 - clearing more large components from the hull. Commander's 75mm Ammo rack and loaders swing out ammo racks

28 August 2021 - With the bins loaned by GD, the Seacan is tidied up & scrap metal removed. Removed the hull Ball Machine Gun Mount